Close-up of a climber's hand gripping a green hold on a mobile climbing wall

Safety & Compliance

Climbing walls are height work with safety-critical equipment. Corporate event organisers and venue H&S teams need documentation they can verify. Here's exactly what we provide.

Insurance & Documentation

  • £5M Public Liability Insurance

    Included on every hire as standard. Certificates provided on request.

  • Indemnity to Principal Cover

    Our insurance extends to cover you, the hiring client, when our staff are supplied.

  • Risk Assessments & Method Statements

    Emailed to your venue before the event — not handed over on the day.

  • Safety Certificates

    Current and verifiable certificates for all equipment provided in advance.

Equipment Safety Standards

  • PUWER Compliant

    Full compliance with Provision and Use of Work Equipment Regulations 1998.

  • BS/EN14960 Manufactured

    Equipment manufactured to British and European safety regulations.

  • Health & Safety at Work Act

    Compliant with the Health and Safety at Work Act 1974.

  • 29+ PIPA Registered Products

    Publicly verifiable tag numbers — check any item's test status online.

  • 34+ RPII Tested Products

    Inspected by Registered Play Inspectors International certified inspectors. Annual inspections via an established testing company, members of BIHA and TIPE.

  • Unique Serial Numbers

    Each item has a unique serial number and full service history log.

Climbing-Specific Safety

  • Auto Belay Systems

    Some of the safest auto belay systems in the world — climbers lower automatically and safely.

  • TRUBLUE Auto Belay

    Magnetic braking on the Enterprise wall — handles climbers 10kg to 150kg.

  • Hydraulic Descent

    Hydraulic descent systems on scramble-net towers for controlled lowering.

  • Fully Trained Staff

    Trained supervisors mandatory on all height equipment — not optional extras.

Staff Training

Every climbing wall hire comes with trained supervising staff. They are not casual labourers — they are trained specifically on our equipment and on working at height.

  • Setup & Breakdown

    Trained on proper assembly and disassembly procedures for every wall.

  • Harness Fitting & Briefing

    Qualified to fit harnesses and deliver safety briefings to all climbers.

  • Supervision at Height

    Certified to supervise climbers at height throughout the event.

  • Emergency Procedures

    Trained in emergency protocols specific to climbing wall operations.

  • Pre-Hire Inspection

    Full equipment inspection carried out before every single hire.

Venue Requirements

  • Flat, stable surface — grass or hard standing
  • Clear overhead space — the 26ft wall needs sufficient ceiling height if indoors
  • Access route at least 2.8m wide and 2.8m high for the Enterprise wall
  • No overhead power lines or obstructions

Bad Weather Policy

  • Enterprise wall rated for outdoor use to wind Force 5 (~17–21 mph)
  • 26ft wall can be lowered if wind speeds become unsafe
  • All walls can operate in light rain
  • If we need to stand down for safety, we'll discuss alternatives with you on the day

What Happens on the Day

  • 1. Site Assessment

    Our crew arrive and assess the site for safety and accessibility.

  • 2. Setup (~30 min)

    The wall is set up in approximately 30 minutes by our trained team.

  • 3. Safety Check

    Full equipment safety check conducted before any climbers go up.

  • 4. Safety Briefing

    A briefing is delivered to all climbers before they start.

  • 5. Harness & Helmet Fitting

    Harnesses and helmets are fitted individually to every climber.

  • 6. Climbing Under Supervision

    Climbing runs under constant supervision for the full duration.

  • 7. Breakdown & Removal

    At the end of the session, we break down and remove everything.

Looking up at a 26ft mobile climbing wall against a blue sky with trees

Request a Quote

Call 0845 468 0610 or fill in our enquiry form. We typically respond the same day.

Get a Quote